Commercial AV pulled clean during framing.

A new-construction commercial building in Erlanger, KY. We prewired the audio, video, and low-voltage runs through steel-stud framing before drywall went up — conduit to every plate location, dressed cable bundles to the equipment room, structured wiring to support TV plates throughout.

// THE BRIEF

Commercial AV done at the right phase — before the walls close.

A new commercial build needed audio, video, and supporting low-voltage runs designed and installed during the framing phase. The GC’s schedule had AV slotted in tight between metal-stud completion and rock — our crew coordinated with the electrical and HVAC trades to pull every cable cleanly, position every backbox, and stage the equipment room before the rock went up.

// SCOPE
  • Design — Coverage planning, plate locations, equipment-room layout
  • Conduit — Low-voltage runs in metal-stud walls + above the steel-truss ceiling
  • Cabling — Audio, video, network — dressed and labeled at every plate
  • Plates & rack — TV mount backboxes, AV plates, equipment-room patch panel
METAL-STUD CONDUIT + LOW-VOLTAGE BACKBOXES · TV BACKBOX WITH 2x12 BRACING
// THE PROJECT

Substantial commercial scale.

Open commercial interior, steel-truss ceiling, polished concrete. The kind of project where AV needs to be specified at design and installed during framing — not retrofitted later. We ran low-voltage in conduit to support TV plates, AV plates, and the equipment-room rack.

Equipment chosen for reliability and warranty — the kind that doesn’t need a service tech showing up the week before opening.